Block planning
Block planning is an industrial planning system used for in-house production. A product type can be produced in different variations using the same resources and following the same basic process plan. Block planning supports the production planning and scheduling for this type of system. A block represents a pre-defined sequence of production orders of variable size.
Block planning enables the planning or pre-assignment of resource capacities in the production process for products with specific attributes. It enables a more rational and efficient use of those capacities. Blocks are defined with specific duration and attributes, for example, three days per block on which products are manufactured in various colours.
In piece-oriented sectors such as metal and paper production, upstream planning is often used to define the type of products and which attributes are to be produced. This typically relates to plant needing to be set up in a particular way, when it is inefficient in terms of time and costs to change the set-up more than is necessary.
There is more emphasis, in piece-oriented production, on the resource for which only one production step is executed. It is usual for an order for run over several resources, in which each of the operations could be grouped according to different aspects.
By contrast, the process industry commonly groups several orders together as a ‘campaign’, which is more defined by the material characteristics of the end product. The emphasis is more on an order level, as the process cannot normally be interrupted once it has begun.
[edit] Related articles on Designing Buildings Wiki
- Advanced manufacturing.
- Agile.
- Design for Manufacture and Assembly (DfMA).
- Just-in-time manufacturing.
- Lean construction.
- Line of balance (LOB).
- Logistics management.
- Major cast metal components.
- Metal fabrication.
- Modular buildings.
- Offsite manufacturing.
- Output-based specification.
- Prefabrication.
Featured articles and news
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
A dynamic brand built for impact stitched into BSRIA’s building fabric.